Pegau windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Pegau
- Country: Germany
- County / Zone: Sachsen
- Total installed power: 11.5 MW
- Estimated annual production: 28 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2011
- 1 turbine(s) Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Developed by: EAB New Energy Group
- Operator: heliotec
- Owner: EAB New Energy Group
Part #2:
Part #3:
- Commissioning: 1999
- 0 turbine(s) (manufacturer name not available) (model not available)
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #4:
- Commissioning: 2007/01
- 1 turbine(s) Vestas V90/2000 (power 2000 kW, diameter 90 m)
- Hub height: 105 m
- Total nominal power: 2000 kW
- Operational
- Onshore wind farm
- Developed by: EAB New Energy Group
Part #5:
- Commissioning: 2009/06
- 2 turbine(s) Enercon E70/2300 (power 2300 kW, diameter 71 m)
- Hub height: 113.5 m
- Total nominal power: 4600 kW
- Operational
- Onshore wind farm
- Developed by: EAB New Energy Group
Update for this sheet: 10/2011