Cabeço Rainha windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Cabeço Rainha
- Country: Portugal
- County / Zone: Castelo Branco
- Total installed power: 22.2 MW
- Estimated annual production: 55 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000
- 17 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Total nominal power: 10200 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner: EDP Renovaveis
Part #2:
- Commissioning: 2003
- 3 turbine(s) Enercon E66/2000 (power 2000 kW, diameter 66 m)
- Total nominal power: 6000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner: EDP Renovaveis
Part #3:
- Commissioning: 2009
- 3 turbine(s) Enercon E66/2000 (power 2000 kW, diameter 66 m)
- Total nominal power: 6000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner: EDP Renovaveis
Update for this sheet: 04/2011
Complete/correct this sheet: contact page