Lomba Seixa windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Lomba Seixa
- Country: Portugal
- County / Zone: Vila Real
- Total installed power: 25 MW
- Estimated annual production: 62 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Part: Lomba Seixa I
- City: Montelegre
- Commissioning: 2001
- 10 turbine(s) Nordex N60/1300 (power 1300 kW, diameter 60 m)
- Hub height: 60 m
- Total nominal power: 13000 kW
- Operational
- Onshore wind farm
- Developed by: Enersis
- Operator: Iberwind
- Owner: Iberwind
Part #2:
- Part: Lomba Seixa II
- Commissioning: 2004
- 8 turbine(s) GE 1.5s (power 1500 kW, diameter 70.5 m)
- Hub height: 64.7 m
- Total nominal power: 12000 kW
- Operational
- Onshore wind farm
- Developed by: Enersis
- Operator: Iberwind
- Owner: Iberwind
Update for this sheet: 04/2011
Complete/correct this sheet: contact page