Ostergard windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Ostergard
- Country: Denmark
- Total installed power: 9.63 MW
- Estimated annual production: 24 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- City: Vrangarp
- 1 turbine(s) Wind World W600/42 (power 600 kW, diameter 42 m)
- Hub height: 50 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2000/11
- 2 turbine(s) Vestas V66/1650 (power 1650 kW, diameter 66 m)
- Hub height: 67 m
- Total nominal power: 3300 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2000/12
- 3 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 45 m
- Total nominal power: 2250 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2002/12
- 2 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 45 m
- Total nominal power: 1500 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1998/06
- 3 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 45 m
- Total nominal power: 1980 kW
- Operational
- Onshore wind farm
Update for this sheet: 04/2011