Sneslev windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Sneslev
- Country: Denmark
- Total installed power: 3.135 MW
- Estimated annual production: 7 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 1992/01
- 1 turbine(s) Windmatic WM20S (power 130 kW, diameter 19 m)
- Hub height: 40 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1990/01
- 2 turbine(s) Windmatic WM20S (power 130 kW, diameter 19 m)
- Hub height: 40 m
- Total nominal power: 260 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2000/06
- 1 turbine(s) Bonus (model not available)
- Hub height: 48 m
- Total nominal power: 1000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2000/10
- 1 turbine(s) Vestas V66/1650 (power 1650 kW, diameter 66 m)
- Hub height: 67 m
- Total nominal power: 1650 kW
- Operational
- Onshore wind farm