Hillerslev windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Hillerslev
- Country: Denmark
- Total installed power: 4.675 MW
- Estimated annual production: 11 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/12
- 1 turbine(s) Vestas V66/1750 (power 1750 kW, diameter 66 m)
- Hub height: 67 m
- Total nominal power: 1750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1995/09
- 1 turbine(s) Vestas V42/600 (power 600 kW, diameter 42 m)
- Hub height: 40.5 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1995/12
- 1 turbine(s) Nordtank (model not available)
- Hub height: 40.9 m
- Total nominal power: 550 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1994/01
- 1 turbine(s) Nordtank NTK500/37 (power 500 kW, diameter 37 m)
- Hub height: 33.8 m
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1993/02
- 1 turbine(s) Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Hub height: 30.5 m
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1993/02
- 1 turbine(s) Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Hub height: 30 m
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1993/12
- 3 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 675 kW
- Operational
- Onshore wind farm