Goderup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Goderup
- Country: Denmark
- County / Zone: Zealand
- Total installed power: 1.5 MW
- Estimated annual production: 3 GW.h (for an equivalent of 2500 hours of full load/year)
Details
- Commissioning: 1994/11
- 3 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height: 40.5 m
- Total nominal power: 1500 kW
- Operational
- Onshore wind farm
- Operator: Dong Energy
Update for this sheet: 03/2011
Complete/correct this sheet: contact page