Amtrup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Amtrup
- Country: Denmark
- Total installed power: 3 MW
- Estimated annual production: 7 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/06
- 1 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 50 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1999/11
- 1 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 50 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1999/11
- 2 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 50 m
- Total nominal power: 1500 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1989/12
- 0 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #5:
- Commissioning: 1990/05
- 0 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page