Borris windfarm, Denmark
[Back to previous page]
Generalities
- Wind farm name : Borris
- Country : Denmark
- Total installed power : 1.45 MW
- Yearly estimated production : 3 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
- Installation : 1991/04
- 4 turbine(s) Neg Micon (turbine model not available)
- Hub height : 30 m
- Total power : 1000 kW
Part #2 :
- Installation : 1992/10
- 2 turbine(s) Vestas V27/225 (puissance de 225 kW, diamètre de 27 m)
- Hub height : 32 m
- Total power : 450 kW
- Total wings surface : 1146 m²