Fabjerg windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Fabjerg
- Country: Denmark
- Total installed power: 1.5 MW
- Estimated annual production: 3 GW.h (for an equivalent of 2500 hours of full load/year)
Details
Part #1:
- Commissioning: 1994/09
- 1 turbine(s) Bonus B31/300 (power 300 kW, diameter 31 m)
- Hub height: 30 m
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1998/11
- 1 turbine(s) Bonus B33/300 (power 300 kW, diameter 33 m)
- Hub height: 30 m
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1992/02
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.9 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1992/05
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.9 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1992/06
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1994/12
- 1 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1988/01
- 0 turbine(s) Vestas V25/200 (power 200 kW, diameter 25 m)
- Hub height: 30 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Update for this sheet: 12/2010