Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Frederikshavn (Denmark)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • City: Frederikshavn
  • Commissioning: 1986/12
  • 0 turbines: Vindsyssel VS150/22 (power 150 kW, diameter 22.6 m)
  • Hub height: 26 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Part #2:

  • Commissioning: 2003/06
  • 1 turbine: Nordex N90/2300 (power 2 300 kW, diameter 90 m)
  • Hub height: 80 m
  • Total nominal power: 2,300 kW
  • Operational
  • Offshore wind farm
  • Developer: Dong Energy
  • Operator: Dong Energy
  • Owner: EDF-EN

       Production forecast

  • From Tuesday, August 30 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 71.7 %
  • Expected production: 39,600 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2003/06
  • 1 turbine: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
  • Hub height: 80 m
  • Total nominal power: 3,000 kW
  • Operational
  • Offshore wind farm
  • Developer: Dong Energy
  • Operator: Dong Energy
  • Owner: EDF-EN

       Production forecast

  • From Tuesday, August 30 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 57.4 %
  • Expected production: 41,360 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Commissioning: 2003/04
  • 1 turbine: Bonus B82/2300 (power 2 300 kW, diameter 82.4 m)
  • Hub height: 80 m
  • Total nominal power: 2,300 kW
  • Operational
  • Offshore wind farm
  • Developer: Dong Energy
  • Operator: Dong Energy
  • Owner: EDF-EN

       Production forecast

  • From Tuesday, August 30 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 63.3 %
  • Expected production: 34,930 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • City: Frederikshavn
  • Commissioning: 2013/12
  • 4 turbines: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
  • Hub height: 80 m
  • Total nominal power: 12,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Tuesday, August 30 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 66.1 %
  • Expected production: 190,410 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 57░ 27' 20.3"
  • Longitude: 10░ 50' 39"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 57░ 26' 23.9"
  • Longitude: 10░ 33' 36"
  • Depth: -3 m
  • Distance from shore: 3 km
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 57░ 26' 23.9"
  • Longitude: 10░ 33' 36"
  • Depth: -3 m
  • Distance from shore: 3 km
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 57░ 26' 23.9"
  • Longitude: 10░ 33' 36"
  • Depth: -3 m
  • Distance from shore: 3 km
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 57░ 27' 20.3"
  • Longitude: 10░ 50' 39"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 04/2016