Chao Falco II windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Chao Falco II
- Country: Portugal
- County / Zone: Leiria
- Total power: 25 MW
- Estimated annual production: 63 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Alqueidao da Serra
- Commissioning: 2009/07
- 11 turbine(s) Nordex N90/2300 (power 2300 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 25,300 kW
- Operational
- Onshore wind farm
- Developed by: Infigen Energy
- Operator: Iberwind
- Owner: Iberwind
Update for this sheet: 03/2012