Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Negrelo-Guilhado (Portugal)


[Back to previous page]

Generalities

PDF

Details



Part #1:

       Production forecast

  • From Friday, July 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 1 %
  • Expected production: 4,910 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2011
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 85 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Operator: EDP Renovaveis

       Production forecast

  • From Friday, July 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 2.3 %
  • Expected production: 1,250 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 41░ 28' 30.1"
  • Longitude: -7░ 37' 37.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 41░ 28' 30.1"
  • Longitude: -7░ 37' 37.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map




Satellite view




Pictures



No photos for this wind farm.

Update for this sheet: 06/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising