Serra de Bornes windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Serra de Bornes
- Country: Portugal
- County / Zone: Bragança
- Total power: 60 MW
- Estimated annual production: 150 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Serra de Bornes
- Commissioning: 2009/05
- 24 turbine(s) Nordex N90/2500 (power 2500 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 60,000 kW
- Operational
- Onshore wind farm
- Developed by: Enersis
- Operator: Iberwind
- Owner: Iberwind
Update for this sheet: 03/2012
Complete/correct this sheet: contact page