Sabina windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: Sabina
- Country: Spain
- County / Zone: Castilla-La Mancha
- Total power: 48 MW
- Estimated annual production: 120 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Pozohondo, Hellín y Liétor
- 24 turbine(s) Gamesa G87/2000 (power 2000 kW, diameter 87 m)
- Total nominal power: 48,000 kW
- Operational
- Onshore wind farm
- Developed by: Iberdrola Renewables
Update for this sheet: 06/2013
Complete/correct this sheet: contact page