Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Vindeby-Lolland (Denmark)


[Back to previous page]

Generalities

PDF

Details


  • Commissioning: 1991/09
  • 11 turbines: Bonus B35/450 (power 450 kW, diameter 35 m)
  • Hub height: 38 m
  • Total nominal power: 4,950 kW
  • Operational
  • Offshore wind farm
  • Operator: Dong Energy
  • Owner: Dong Energy

       Production forecast

  • From Thursday, September 01 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 39.3 %
  • Expected production: 46,650 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


  • Latitude: 54░ 58' 11.9"
  • Longitude: 11░ 7' 48"
  • Depth: -3 m
  • Distance from shore: 2 km
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 04/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising