Generalities

  • Wind farm name: Gottrup
  • Country: Denmark

Details



Part #1:

  • City: Gettrup
  • Commissioning: 1988/04
  • 0 turbines: Vestas V20/100 (power 100 kW, diameter 20 m)
  • Hub height: 24 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Part #2:

  • City: Gottrup
  • Commissioning: 1996/01
  • 2 turbines: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 36 m
  • Total nominal power: 800 kW
  • Operational
  • Onshore wind farm

Part #3:

  • City: Gottrup
  • Commissioning: 1994/03
  • 1 turbine: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Part #4:

  • City: Gottrup
  • Commissioning: 1994/06
  • 1 turbine: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Part #5:

  • City: Gottrup
  • Commissioning: 1995/06
  • 1 turbine: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Part #6:

  • City: Gottrup
  • Commissioning: 1995/12
  • 1 turbine: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Part #7:

  • City: Gottrup
  • Commissioning: 1996/01
  • 1 turbine: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Part #8:

  • City: Gottrup
  • Commissioning: 1996/11
  • 2 turbines: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 800 kW
  • Operational
  • Onshore wind farm

Part #9:

  • City: Gottrup
  • Commissioning: 1996/09
  • 1 turbine: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 37 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Part #10:

  • City: Gottrup
  • Commissioning: 1994/07
  • 3 turbines: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 1,200 kW
  • Operational
  • Onshore wind farm

Part #11:

  • City: Gottrup
  • Commissioning: 1995/09
  • 1 turbine: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Part #12:

  • City: Gottrup
  • Commissioning: 1995/12
  • 1 turbine: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Part #13:

  • City: Gottrup
  • Commissioning: 1996/10
  • 2 turbines: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 36 m
  • Total nominal power: 800 kW
  • Operational
  • Onshore wind farm

Part #14:

  • City: Gottrup
  • Commissioning: 1996/06
  • 2 turbines: Micon M750-400/100 (power 400 kW, diameter 31 m)
  • Hub height: 35 m
  • Total nominal power: 800 kW
  • Operational
  • Onshore wind farm

Part #15:

  • City: Gottrup
  • Commissioning: 1988/11
  • 2 turbines: Micon M530/24 (power 250 kW, diameter 24 m)
  • Hub height: 30 m
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm

Part #16:

  • City: Gettrup
  • Commissioning: 1988/04
  • 0 turbines: Neg Micon
  • Hub height: 30 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Part #17:

  • City: Gettrup
  • Commissioning: 1993/06
  • 0 turbines: Micon M530 (power 250 kW, diameter 26 m)
  • Hub height: 30 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Part #18:

  • City: Gettrup
  • Commissioning: 1993/08
  • 0 turbines: Micon M530 (power 250 kW, diameter 26 m)
  • Hub height: 30 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Part #19:

  • City: Gettrup
  • Commissioning: 1982/01
  • 0 turbines: Danregn
  • Hub height: 24 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Part #20:

  • City: Gettrup
  • Commissioning: 1988/11
  • 1 turbine: Neg Micon
  • Hub height: 29 m
  • Total nominal power: 250 kW
  • Operational
  • Onshore wind farm

Part #21:

  • City: Gettrup
  • Commissioning: 1988/11
  • 1 turbine: Neg Micon
  • Hub height: 30 m
  • Total nominal power: 250 kW
  • Operational
  • Onshore wind farm

Part #22:

  • City: Gettrup
  • Commissioning: 1996/09
  • 1 turbine: Neg Micon
  • Hub height: 37 m
  • Total nominal power: 400 kW
  • Operational
  • Onshore wind farm

Localisation



Part #1:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #9:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #10:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #11:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #12:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #13:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #14:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #15:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #16:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #17:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #18:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #19:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #20:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #21:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #22:

  • Latitude: 57░ 3' 29.3"
  • Longitude: 9░ 12' 42.8"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



Turbine 10500
Author: Aaron Donoghue - License: All right reserved
Picture reference: 10500

Update for this sheet: 12/2015