Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Top Speed Waldfeucht (Germany)


[Back to previous page]

Generalities

PDF

Details

  • City: Waldfeucht
  • Commissioning: 2003
  • 1 turbine: Enercon E44/600 (power 600 kW, diameter 44 m)
  • Hub height: 65 m
  • Total nominal power: 600 kW
  • Operational
  • Onshore wind farm
  • Developer: BMR
  • Operator: BMR
  • Owner: BMR

       Production forecast

  • From Sunday, December 11 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 48.7 %
  • Expected production: 7,010 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation

  • Latitude: 51░ 3' 57.4"
  • Longitude: 5░ 59' 17.7"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: /
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising