Top Speed Waldfeucht windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Top Speed Waldfeucht
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 1 MW
- Estimated annual production: 1 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Waldfeucht
- Commissioning: 2003
- 1 turbine(s) Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height: 65 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Developed by: BMR
- Operator: BMR
Update for this sheet: 06/2012
Complete/correct this sheet: contact page