Bergheim windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Bergheim
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 12 MW
- Estimated annual production: 30 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Bergheim
- Commissioning: 2003
- 5 turbine(s) Enron 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developed by: BMR
- Operator: BMR
Part #2:
- City: Bergheim
- Commissioning: 2005
- 3 turbine(s) Repower MD77 (power 1500 kW, diameter 77 m)
- Hub height: 61.5 m
- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
- Developed by: Energiekontor
- Owner: Energiekontor
Update for this sheet: 05/2012
Complete/correct this sheet: contact page