Generalities
- Wind farm name: Friedland
- Country: Germany
- County / Zone: Mecklenburg-Vorpommern
- Total power: 53 MW
- Estimated annual production: 132 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002
- 6 turbine(s) GE 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developed by: Energiekontor
- Owner: Energiekontor
Part #2:
Part #3:
- Commissioning: 2000
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 6,500 kW
- Operational
- Onshore wind farm
Part #4:
- 5 turbine(s) Nordex N60/1300 (power 1300 kW, diameter 60 m)
- Hub height: 60 m
- Total nominal power: 6,500 kW
- Operational
- Onshore wind farm
- Developed by: MBBF
Part #5:
- Commissioning: 2002
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1996/11
- 2 turbine(s) Tacke TW-600 (power 600 kW, diameter 43 m)
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 2004
- 2 turbine(s) GE 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #8:
- Commissioning: 2009
- 6 turbine(s) (manufacturer name not available)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Part #9:
- Commissioning: 1994/07
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Part #10:
- Commissioning: 1996/05
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page