Schwanewede windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Schwanewede
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 15 MW
- Estimated annual production: 37 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2001
- 2 turbine(s) GE 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developed by: Energiekontor
- Owner: Energiekontor
Part #2:
- Commissioning: 2008
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1995
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2003/11
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2002/12
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012