Veddum windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Veddum
- Country: Denmark
- Total power: 8 MW
- Estimated annual production: 20 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000
- 6 turbine(s) Neg Micon NM60/1000 (power 1000 kW, diameter 60 m)
- Hub height: 45 m
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1999/12
- 2 turbine(s) Neg Micon NM60/1000 (power 1000 kW, diameter 60 m)
- Hub height: 45 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1987/06
- 0 turbine(s) Danwin
- Hub height: 26 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page