Glinzendorf windfarm (Austria)
[Back to previous page]
Generalities
- Wind farm name: Glinzendorf
- Country: Austria
- County / Zone: Niederösterreich
- Total power: 19 MW
- Estimated annual production: 48 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: Glinzendorf I
- Commissioning: 1999/02
- 1 turbine(s) Lagerwey LW750-52 (power 750 kW, diameter 52 m)
- Hub height: 75 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Developed by: Ecowind GmbH
- Operator: Ecowind GmbH
Part #2:
- Part: Glinzendorf II
- Commissioning: 1996/12
- 1 turbine(s) Nordex N29/250 (power 250 kW, diameter 29 m)
- Hub height: 50 m
- Total nominal power: 250 kW
- Operational
- Onshore wind farm
Part #3:
- Part: Glinzendorf II I
- Commissioning: 2012
- 9 turbine(s) Repower MM92/2050 (power 2050 kW, diameter 92 m)
- Total nominal power: 18,450 kW
- Operational
- Onshore wind farm
Update for this sheet: 01/2013
Complete/correct this sheet: contact page