The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Espa˝ol 

Online access > Wind farms > Bobbau (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • City: Bobbau
  • Commissioning: 2005/06
  • 5 turbines: Dewind D8.0 (power 2 000 kW, diameter 80 m)
  • Hub height: 100 m
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, February 25 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 27.8 %
  • Expected production: 66,600 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Bobbau
  • Commissioning: 2002
  • 5 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 96 m
  • Total nominal power: 7,500 kW
  • Operational
  • Onshore wind farm
  • Developer: Enertrag

       Production forecast

  • From Saturday, February 25 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 31.6 %
  • Expected production: 56,940 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Bobbau
  • Commissioning: 2007
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, February 25 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 23.9 %
  • Expected production: 13,190 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 51░ 41' 26.3"
  • Longitude: 12░ 15' 53.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51░ 42' 2.9"
  • Longitude: 12░ 13' 27"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Latitude: 51░ 41' 26.3"
  • Longitude: 12░ 15' 53.6"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:

Eoltech