Bockenem windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Bockenem
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 27 MW
- Estimated annual production: 67 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2001/03
- 5 turbine(s) GE 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developed by: EBV
- Owner: Ökorenta Windfond
Part #2:
- Commissioning: 2003/09
- 8 turbine(s) Tacke 1.5i (power 1500 kW, diameter 65 m)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2002/09
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
Update for this sheet: 06/2012