Glinzendorf windfarm (Austria)
[Back to previous page]
Generalities
- Wind farm name: Glinzendorf
- Country: Austria
- County / Zone: Niederösterreich
- Total power: 1 MW
- Estimated annual production: 2 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/02
- 1 turbine(s) Lagerwey LW750-52 (power 750 kW, diameter 52 m)
- Hub height: 75 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Developed by: Ecowind GmbH
- Operator: Ecowind GmbH
Part #2:
- Commissioning: 1996/12
- 1 turbine(s) Nordex N29/250 (power 250 kW, diameter 29 m)
- Hub height: 50 m
- Total nominal power: 250 kW
- Operational
- Onshore wind farm
Update for this sheet: 01/2011