Dornstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Dornstedt
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total power: 26 MW
- Estimated annual production: 65 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2001
- 10 turbine(s) Enercon E66/1800 (power 1800 kW, diameter 66 m)
- Hub height: 98 m
- Total nominal power: 18,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2005
- 2 turbine(s) Enercon E70/E4 (power 2000 kW, diameter 70 m)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2006
- 2 turbine(s) Enercon
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page