Part #1:

  • Commissioning: 2005
  • 3 turbines: (manufacturer name not available)
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, July 23 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 24.1 %
  • Expected production: 34,690 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2003
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 1,500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, July 23 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 25.4 %
  • Expected production: 9,150 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2000/11
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, July 23 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 21.9 %
  • Expected production: 2,630 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 51░ 30' 43.3"
  • Longitude: 7░ 27' 48.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51░ 30' 43.3"
  • Longitude: 7░ 27' 48.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 51░ 30' 43.3"
  • Longitude: 7░ 27' 48.8"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 2 July 2015
Complete/correct this sheet: