Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Dortmund (Germany)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • Commissioning: 2005
  • 3 turbines: (manufacturer name not available)
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Wednesday, September 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 40.9 %
  • Expected production: 58,890 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2003
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 1,500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Wednesday, September 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 59.3 %
  • Expected production: 21,360 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2000/11
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Wednesday, September 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 32.3 %
  • Expected production: 3,880 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 51░ 30' 43.3"
  • Longitude: 7░ 27' 48.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51░ 30' 43.3"
  • Longitude: 7░ 27' 48.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 51░ 30' 43.3"
  • Longitude: 7░ 27' 48.8"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising