Emmerich windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Emmerich
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 9 MW
- Estimated annual production: 22 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2003
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2003
- 1 turbine(s) Repower MD70 (power 1500 kW, diameter 70 m)
- Hub height: 85 m
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2003
- 2 turbine(s) Repower MD77 (power 1500 kW, diameter 77 m)
- Hub height: 100 m
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1992
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 150 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1994/12
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010