Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Esche (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • City: Esche
  • Commissioning: 2007
  • 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Hub height: 108 m
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WEA GmbH
  • Operator: WEA GmbH
  • Owner: WEA GmbH

       Production forecast

  • From Tuesday, December 06 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 5.6 %
  • Expected production: 2,690 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Esche
  • Commissioning: 2003
  • 4 turbines: Enercon E66/2000 (power 2 000 kW, diameter 66 m)
  • Hub height: 114 m
  • Total nominal power: 8,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WEA GmbH
  • Operator: WEA GmbH
  • Owner: WEA GmbH

       Production forecast

  • From Tuesday, December 06 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 4.6 %
  • Expected production: 8,900 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 52░ 32' 58.9"
  • Longitude: 6░ 59' 11"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 52░ 32' 58.9"
  • Longitude: 6░ 59' 11"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map



Satellite view



Pictures


No photos for this wind farm.

Update for this sheet: 11/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising