Generalities

PDF

Details


Part #1:

  • City: Eschweiler
  • Commissioning: 1993
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 250 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, February 24 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 38.1 %
  • Expected production: 2,290 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Eschweiler
  • Commissioning: 2008
  • 2 turbines: Gamesa G80/2000 (power 2 000 kW, diameter 80 m)
  • Hub height: 100 m
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Gamesa
  • Operator: Infigen Energy

       Production forecast

  • From Friday, February 24 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 34.1 %
  • Expected production: 32,700 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 50░ 49' 2.7"
  • Longitude: 6░ 16' 18"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 50░ 49' 2.7"
  • Longitude: 6░ 16' 18"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 05/2016