Espelkamp windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Espelkamp
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 8 MW
- Estimated annual production: 21 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
Part #2:
- City: Frotheim
- Commissioning: 2009/05
- 3 turbine(s) Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
- Developed by: Plan 8
Part #3:
- City: Frotheim
- Commissioning: 2000/12
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #4:
- City: Frotheim
- Commissioning: 1995/11
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Update for this sheet: 01/2011
Complete/correct this sheet: contact page