Novy Hradek windfarm (Czech Republic)
[Back to previous page]
Generalities
- Wind farm name: Novy Hradek
- Country: Czech Republic
- Total power: 2 MW
- Estimated annual production: 5 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 1,600 kW
- Operational
- Onshore wind farm
- Operator: CEZ Renewable Energies
Part #2:
- Turbine(s) (manufacturer name not available)
- Total nominal power: 400 kW
- Operational
- Onshore wind farm
Update for this sheet: 03/2012
Complete/correct this sheet: contact page