Havsnäs windfarm (Sweden)
[Back to previous page]
Generalities
- Wind farm name: Havsnäs
- Country: Sweden
- County / Zone: Jämtland
- Total power: 95 MW
- Estimated annual production: 238 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Strömsund
- Commissioning: 2010/10
- 45 turbine(s) Vestas V90/2000 (power 2000 kW, diameter 90 m)
- Total nominal power: 90,000 kW
- Operational
- Onshore wind farm
- Developed by: RES
- Operator: RES
- Owner: RES
Part #2:
- City: Strömsund
- Commissioning: 2010/10
- 3 turbine(s) Vestas V90/1800 (power 1800 kW, diameter 90 m)
- Total nominal power: 5,400 kW
- Operational
- Onshore wind farm
- Developed by: RES
- Operator: RES
- Owner: RES
Update for this sheet: 05/2012
Complete/correct this sheet: contact page