Goldenstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Goldenstedt
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 7 MW
- Estimated annual production: 17 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2004/12
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2001/12
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 3,900 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2004/07
- 1 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height: 65 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012