Höxter windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Höxter
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 9 MW
- Estimated annual production: 22 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2003
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2001/08
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 2,600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2001
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2002/10
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 02/2011
Complete/correct this sheet: contact page