Langlingen windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Langlingen
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 2 MW
- Estimated annual production: 6 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2001/02
- 1 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 70 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #2:
- City: Celle
- Commissioning: 2004/10
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
- Developed by: Windstrom
- Operator: Windstrom
- Owner: Windstrom
Part #3:
- Commissioning: 2005/07
- Turbine(s) (manufacturer name not available)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page