Lichtenau windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Lichtenau
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 79 MW
- Estimated annual production: 198 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Lichtenau
- 16 turbine(s) Nordex
- Total nominal power: 20,800 kW
- Operational
- Onshore wind farm
Part #2:
- City: Lichtenau
- Commissioning: 1993
- Turbine(s) (manufacturer name not available)
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #3:
- City: Lichtenau
- Commissioning: 1998
- Turbine(s) (manufacturer name not available)
- Total nominal power: 21,600 kW
- Operational
- Onshore wind farm
Part #4:
- City: Lichtenau
- Commissioning: 1998
- Turbine(s) (manufacturer name not available)
- Total nominal power: 17,000 kW
- Operational
- Onshore wind farm
Part #5:
- City: Lichtenau
- Turbine(s) (manufacturer name not available)
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #6:
- City: Lichtenau
- Commissioning: 2007
- Turbine(s) (manufacturer name not available)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
Part #7:
- City: Lichtenau
- Commissioning: 1998
- Turbine(s) (manufacturer name not available)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #8:
- City: Lichtenau
- Turbine(s) (manufacturer name not available)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #9:
- City: Lichtenau
- Commissioning: 1998/12
- Turbine(s) (manufacturer name not available)
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Part #10:
- City: Lichtenau
- Commissioning: 1998/11
- Turbine(s) (manufacturer name not available)
- Total nominal power: 270 kW
- Operational
- Onshore wind farm
Part #11:
- City: Lichtenau
- Commissioning: 1998/03
- 20 turbine(s) Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developed by: Winkra
- Operator: RWE
- Owner: RWE
Update for this sheet: 05/2012