Part #1:

  • Commissioning: 2002
  • 6 turbines: (manufacturer name not available)
  • Total nominal power: 10,800 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, December 08 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 81.9 %
  • Expected production: 212,350 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2003
  • 3 turbines: (manufacturer name not available)
  • Total nominal power: 5,400 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, December 08 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 76.7 %
  • Expected production: 99,340 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 54░ 30' 51.9"
  • Longitude: 9░ 13' 36.7"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 54░ 30' 51.9"
  • Longitude: 9░ 13' 36.7"
  • Geodetic system: WGS84
  • Precise localization: no