Wind power and windfarms database
Eoltech

English English Deutsch Español


Eoltech

Online access > Wind farms > Schwaförden (Germany)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • City: Schwaförden
  • Commissioning: 2005/06
  • 5 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height: 114 m
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WestWind
  • Operator: WestWind

       Production forecast

  • From Monday, June 27 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 25.3 %
  • Expected production: 60,640 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Schwaförden
  • Commissioning: 2005/06
  • 11 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height: 114 m
  • Total nominal power: 22,000 kW
  • Operational
  • Onshore wind farm
  • Developer: WestWind
  • Operator: WestWind
  • Owner: WestWind

       Production forecast

  • From Monday, June 27 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 32.3 %
  • Expected production: 170,440 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 52° 45' 24"
  • Longitude: 8° 48' 19"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 52° 45' 24"
  • Longitude: 8° 48' 19"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map




Satellite view




Pictures



No photos for this wind farm.

Update for this sheet: 05/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising