Schwesing windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Schwesing
- Country: Germany
- County / Zone: Schleswig-Holstein
- Total power: 11 MW
- Estimated annual production: 27 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2001
- 5 turbine(s) Repower 57/1000 (power 1000 kW, diameter 57 m)
- Hub height: 60 m
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2004/06
- 1 turbine(s) Repower MM82 (power 2000 kW, diameter 82 m)
- Hub height: 59 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2001
- 1 turbine(s) Repower 57/1000 (power 1000 kW, diameter 57 m)
- Hub height: 55 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2001
- 3 turbine(s) Repower 57/1000 (power 1000 kW, diameter 57 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 02/2011