Wesenstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Wesenstedt
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 8 MW
- Estimated annual production: 20 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- Commissioning: 2005/05
- 4 turbine(s) Enercon E70/E4 (power 2000 kW, diameter 70 m)
- Hub height: 113.5 m
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developed by: WestWind
Update for this sheet: 01/2011