Autremencourt windfarm (France)
[Back to previous page]
Generalities
- Wind farm name: Autremencourt
- Country: France
- County / Zone: 02
- Total power: 28 MW
- Estimated annual production: 68 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: Partie 1
- City: Neuville Bosmont, Curieux, Autremencourt
- Commissioning: 2009/07
- 5 turbine(s) Nordex N90/2500 (power 2500 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 12,500 kW
- Operational
- Onshore wind farm
- Developed by: Eole Futur
- Operator: Kallista
- Owner: Kallista
Part #2:
- Part: Partie 2
- City: Neuville Bosmont, Curieux, Autremencourt
- Commissioning: 2009/04
- 5 turbine(s) Nordex N90/2500 (power 2500 kW, diameter 90 m)
- Hub height: 100 m
- Total nominal power: 12,500 kW
- Operational
- Onshore wind farm
- Operator: Wind Prospect
Part #3:
- Part: Partie 3
- City: Neuville Bosmont, Curieux, Autremencourt
- Commissioning: 2009/08
- 1 turbine(s) Nordex N90/2500 (power 2500 kW, diameter 90 m)
- Hub height: 100 m
- Total nominal power: 2,500 kW
- Operational
- Onshore wind farm
Update for this sheet: 04/2012