Büttel windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Büttel
- Country: Germany
- County / Zone: Schleswig-Holstein
- Total power: 20 MW
- Estimated annual production: 50 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Büttel
- Commissioning: 1997/01
- 4 turbine(s) Vestas
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Büttel
- Commissioning: 1995
- 4 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height: 50 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: WKN AG
- Operator: WKN AG
Part #3:
- City: Büttel
- Commissioning: 1995
- 6 turbine(s) (manufacturer name not available)
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
Part #4:
- City: Büttel
- Commissioning: 1998/11
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #5:
- City: Büttel
- Commissioning: 1999/08
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
Part #6:
- City: Büttel
- Commissioning: 2007
- 2 turbine(s) Repower 5M (power 5000 kW, diameter 126 m)
- Hub height: 117 m
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
Part #7:
- City: Büttel
- Commissioning: 2007
- 3 turbine(s) Repower 5M (power 5000 kW, diameter 126 m)
- Hub height: 117 m
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page