Hove windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Hove
- Country: Denmark
- Total power: 1 MW
- Estimated annual production: 3 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1991/10
- 3 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.7 m
- Total nominal power: 675 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1992/01
- 2 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.9 m
- Total nominal power: 450 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1989/02
- 1 turbine(s) Danwin 24/200 (power 200 kW, diameter 24 m)
- Hub height: 30 m
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1991/10
- 0 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.7 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page