Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Ormonde (United-Kingdom)


[Back to previous page]

Generalities

PDF

Details


  • Commissioning: 2012/02
  • 30 turbines: Repower 5M (power 5 000 kW, diameter 126 m)
  • Hub height: 97 m
  • Total nominal power: 150,000 kW
  • Operational
  • Offshore wind farm
  • Developer: Vattenfall
  • Operator: Vattenfall
  • Owners: Vattenfall/AMF

       Production forecast

  • From Monday, September 26 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 60.8 %
  • Expected production: 2,187,330 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


  • Latitude: 54░ 5' 16.8"
  • Longitude: -3░ 26' 13.1"
  • Depth: -20 m
  • Distance from shore: 10 km
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising