The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Düngenheim (Germany)


[Back to previous page]

Germany wind farms file: buy now

Generalities

PDF

Details


Part #1:

  • Commissioning: 2009
  • 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Hub height: 95 m
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: ABO-Wind
  • Operator: ABO-Wind
  • Source: https://www.abo-wind.com/de/referenzen/windkraftanlagen.html

       Production forecast

  • From Sunday, July 23 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 38 %
  • Expected production: 36,510 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2001
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 1,200 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, July 23 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 33.7 %
  • Expected production: 9,700 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Drochtersen
  • Commissioning: 2003/12
  • 4 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 80 m
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Developers: UMaAG/Net Service GmbH
  • Source: http://bf-net.net/referenzen
  • Source: http://www.umwelt-management.de/referenzen

       Production forecast

  • From Sunday, July 23 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 37.6 %
  • Expected production: 54,190 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Commissioning: 2013/10
  • 1 turbine: Enercon E53/800 (power 800 kW, diameter 52.9 m)
  • Hub height: 73 m
  • Total nominal power: 800 kW
  • Operational
  • Onshore wind farm
  • Developers: Net Service GmbH/BOREAS
  • Source: http://bf-net.net/referenzen
  • Source: http://www.boreas.com/

       Production forecast

  • From Sunday, July 23 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 41.1 %
  • Expected production: 7,890 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • Commissioning: 2013/10
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 85 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Developers: Net Service GmbH/BOREAS
  • Source: http://bf-net.net/referenzen
  • Source: http://www.boreas.com/

       Production forecast

  • From Sunday, July 23 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 31 %
  • Expected production: 17,140 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 2 June 2017
Complete/correct this sheet: