Part #1:

  • Commissioning: 2009
  • 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Hub height: 95 m
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: ABO-Wind
  • Operator: ABO-Wind

       Production forecast

  • From Tuesday, March 28 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 0 %
  • Expected production: 0 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2001
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 1,200 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Tuesday, March 28 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 0 %
  • Expected production: 0 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Drochtersen
  • Commissioning: 2003/12
  • 4 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
  • Hub height: 80 m
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Developers: UMaAG/Net Service GmbH

       Production forecast

  • From Tuesday, March 28 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 0 %
  • Expected production: 0 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Commissioning: 2013/10
  • 1 turbine: Enercon E53/800 (power 800 kW, diameter 52.9 m)
  • Hub height: 73 m
  • Total nominal power: 800 kW
  • Operational
  • Onshore wind farm
  • Developers: Net Service GmbH/BOREAS

       Production forecast

  • From Tuesday, March 28 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 0 %
  • Expected production: 0 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • Commissioning: 2013/10
  • 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Hub height: 85 m
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Developers: Net Service GmbH/BOREAS

       Production forecast

  • From Tuesday, March 28 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 0 %
  • Expected production: 0 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 50° 15' 31.3"
  • Longitude: 7° 10' 10.4"
  • Geodetic system: WGS84
  • Precise localization: no