Xiangshui Intertidal Pilot Project windfarm (China)
[Back to previous page]
Generalities
- Wind farm name: Xiangshui Intertidal Pilot Project
- Country: China
- Total power: 7 MW
- Estimated annual production: 16 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: Goldwind
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 2,500 kW
- Operational
- Offshore wind farm
Part #2:
- Part: Shangai Electric
- 1 turbine(s) Shanghai Electric
- Total nominal power: 2,000 kW
- Operational
- Offshore wind farm
Part #3:
- Part: Turbine 3
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 2,000 kW
- Operational
- Offshore wind farm
Update for this sheet: 09/2011
Complete/correct this sheet: contact page