Wilhermsdorf windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Wilhermsdorf
- Country: Germany
- County / Zone: Bayern
- Total power: 26 MW
- Estimated annual production: 66 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
Part #2:
- Commissioning: 2009/02
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Wilhermsdorf
- Commissioning: 2009
- 4 turbine(s) Enercon E82/2300 (power 2300 kW, diameter 82 m)
- Hub height: 138 m
- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
Part #4:
- City: Wilhermsdorf
- Commissioning: 2011
- 2 turbine(s) Enercon E82/2000 (power 2000 kW, diameter 82 m)
- Hub height: 138 m
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 03/2012