Generalities

  • Wind farm name: Arada-Montemuro
  • Country: Portugal
  • County / Zone: Viseu
PDF

Details


Part #1:

  • Part: Arada
  • Commissioning: 2008
  • 25 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Eolica da Arada
  • Operator: EDF-EN
  • Owner: EDF-EN
  • Source: http://e2p.inegi.up.pt/index.asp

       Production forecast

  • From Saturday, July 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 4.7 %
  • Expected production: 56,790 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Part: Aveloso
  • Commissioning: 2008
  • 3 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Eolica da Arada
  • Operator: EDF-EN
  • Owner: EDF-EN
  • Source: http://e2p.inegi.up.pt/index.asp

       Production forecast

  • From Saturday, July 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 4.7 %
  • Expected production: 6,820 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Part: Cabria
  • 4 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Total nominal power: 9,400 kW
  • Operational
  • Onshore wind farm
  • Developer: Eolica da Arada
  • Operator: EDF-EN
  • Owner: EDF-EN
  • Source: http://e2p.inegi.up.pt/index.asp

Part #4:

  • Part: Carvalhosa
  • 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Total nominal power: 4,700 kW
  • Operational
  • Onshore wind farm
  • Source: http://e2p.inegi.up.pt/index.asp

Part #5:

  • Part: Carvalhosa
  • Commissioning: 2008
  • 11 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Total nominal power: 22,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Eolica da Arada
  • Operator: EDF-EN
  • Owner: EDF-EN
  • Source: http://e2p.inegi.up.pt/index.asp

       Production forecast

  • From Saturday, July 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 4.7 %
  • Expected production: 24,990 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #6:

  • Part: Manhouce
  • 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Total nominal power: 4,700 kW
  • Operational
  • Onshore wind farm
  • Source: http://e2p.inegi.up.pt/index.asp

Part #7:

  • Part: Picao
  • Commissioning: 2008
  • 17 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Total nominal power: 34,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Eolica da Arada
  • Operator: EDF-EN
  • Owner: EDF-EN
  • Source: http://e2p.inegi.up.pt/index.asp

       Production forecast

  • From Saturday, July 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 5.5 %
  • Expected production: 44,640 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #8:

  • Part: Picao
  • 1 turbine: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
  • Total nominal power: 2,350 kW
  • Operational
  • Onshore wind farm
  • Source: http://e2p.inegi.up.pt/index.asp

Localisation


Part #1:

  • Part: Arada
  • Latitude: 40░ 56' 47.6"
  • Longitude: -8░ 2' 12.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Part: Aveloso
  • Latitude: 40░ 56' 47.6"
  • Longitude: -8░ 2' 12.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Part: Cabria
  • Latitude: 40░ 56' 47.6"
  • Longitude: -8░ 2' 12.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Part: Carvalhosa
  • Latitude: 40░ 56' 47.6"
  • Longitude: -8░ 2' 12.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Part: Carvalhosa
  • Latitude: 40░ 56' 47.6"
  • Longitude: -8░ 2' 12.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Part: Manhouce
  • Latitude: 40░ 56' 47.6"
  • Longitude: -8░ 2' 12.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Part: Picao
  • Latitude: 40░ 56' 47.6"
  • Longitude: -8░ 2' 12.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Part: Picao
  • Latitude: 40░ 56' 47.6"
  • Longitude: -8░ 2' 12.3"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 17 July 2017
Complete/correct this sheet: